MACHINING.TRPrecision Machining. Engineered in Turkey.
Batch of turned stainless steel rings
  1. Home
  2. Industries
  3. Chemical processing

Chemical processing

Chemical process equipment needs corrosion-resistant materials and certified traceability.

Reactors, mixers, pumps and valves in chemical plants use flanges, nozzles, shafts and seals in stainless, duplex, nickel alloys and fluoropolymers. Material selection depends on media and temperature.

Typical machined components

  • Flanges and nozzles
  • Agitator shafts and hubs
  • Valve and pump parts
  • Seal housings
  • PTFE seats and liners
  • Instrument fittings
Batch of turned stainless steel rings
Batch of turned stainless steel rings

Common materials

  • 1.4404 (316L)
  • 1.4571 (316Ti)
  • 1.4462 (2205)
  • Alloy 625
  • PTFE
  • PE-UHMW

Materials · Material Equivalents

Manufacturing processes

Machining challenges

  • Nickel alloys and duplex
  • Contamination control on stainless
  • Pressure-retaining parts
  • Explosion-protection requirements

Dimensional requirements

Flange faces and seal fits per standards; general tolerances ISO 2768-m.

Surface finish requirements

Seal faces Ra 0.8 µm; passivated surfaces.

Inspection requirements

PMI, certificates 3.1/3.2, pressure-test coordination where required.

Relevant standards

PED 2014/68/EUEU Pressure Equipment Directive — conformity of pressure equipment and assemblies.
ATEX 2014/34/EUEU directive for equipment intended for use in potentially explosive atmospheres.
EN 10088-3Stainless steels — semi-finished products, bars, rods, wire and sections for general purposes.
ISO 228-1Parallel pipe threads where pressure-tight joints are not made on the threads (G threads).
EN 10204Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts.

Engineering considerations

  • Specify alloy for media
  • Define passivation
  • Clarify PED category
  • Specify ATEX requirements

Potential manufacturing solutions

Turning and milling with segregated stainless processing and coordinated passivation and testing.

Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.

Enquiry

Have a drawing to review?

Send your 2D drawing and 3D model with quantities, material and required documents. An engineer reviews manufacturability, tolerances and inspection before quoting.

What to include in your enquiry