Ships, workboats and offshore installations use machined bronze, duplex and stainless parts in propulsion, steering, deck equipment and seawater systems. Classification rules may require approved materials and certificates.
Typical machined components
- Propeller shaft components
- Rudder stock parts and bushings
- Seawater valve and pump parts
- Deck hardware
- Stern tube and seal parts
- Couplings and flanges

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- Nickel-aluminium bronze and duplex machinability
- Large shaft components
- Galvanic compatibility
- Class certificates
Dimensional requirements
Bearing and seal fits per ISO 286; tapers and keyways to standards.
Surface finish requirements
Seal zones Ra 0.4–0.8 µm; general surfaces Ra 3.2 µm.
Inspection requirements
Dimensional reports, PMI, certificates 3.1 or 3.2; class surveyor witness can be arranged on request.
Relevant standards
| Class rules (DNV, LR, ABS, BV) | Rules of marine classification societies for materials, components and their certification. |
| EN 10204 | Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts. |
| ISO 228-1 | Parallel pipe threads where pressure-tight joints are not made on the threads (G threads). |
| ISO 2768-1 / -2 | General tolerances for linear and angular dimensions (part 1: f, m, c, v) and for geometrical features without individual indications (part 2: H, K, L). Part 2 is being superseded by ISO 22081. |
| ISO 9001 | Quality management systems — requirements. |
Engineering considerations
- Select materials for galvanic compatibility
- Specify class requirements upfront
- Define sealing-surface finish
- Plan protective packaging
Potential manufacturing solutions
Turning and milling with coordinated material certification and class inspection on request.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.