Rolling stock and infrastructure use machined brackets, pins, bushings, housings and interior parts. Many are combined with welded structures that must meet railway welding and fire-protection requirements.
Typical machined components
- Brake and coupling components
- Bogie brackets and pins
- Bushings and bearing housings
- Door and interior mechanisms
- Electrical enclosures
- Track and signalling parts

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- Fatigue under vibration
- Machining after welding
- Corrosion protection
- Material compliance for interiors
Dimensional requirements
Fits per ISO 286; general tolerances ISO 2768-m; welded assemblies machined after stress relief.
Surface finish requirements
Ra 1.6–3.2 µm; coating-ready surfaces.
Inspection requirements
Dimensional reports, material certificates, and NDT of welds through partners.
Relevant standards
| ISO/TS 22163 | Railway applications — quality management system requirements (railway sector application of ISO 9001). |
| EN 45545-2 | Railway applications — fire protection of railway vehicles; requirements for fire behaviour of materials. |
| EN 15085 | Railway applications — welding of railway vehicles and components. |
| EN 10204 | Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts. |
| ISO 2768-1 / -2 | General tolerances for linear and angular dimensions (part 1: f, m, c, v) and for geometrical features without individual indications (part 2: H, K, L). Part 2 is being superseded by ISO 22081. |
Engineering considerations
- Specify fatigue-relevant radii
- Define welding class where applicable
- Clarify coating systems
- Specify fire-protection requirements for non-metallic parts
Potential manufacturing solutions
Machining combined with fabrication and coating through our manufacturing network. Railway certifications are not implied.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.