Electronics manufacturers use machined enclosures, heat sinks, RF housings, connector pins and insulating parts. Cosmetic finishes, flatness of thermal interfaces and conductivity matter.
Typical machined components
- Enclosures and covers
- Heat sinks and cold plates
- RF and microwave housings
- Connector pins and contacts
- Insulators and spacers
- Panel parts

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- Thin walls and fine pockets
- Flatness of thermal interfaces
- Copper burrs
- Cosmetic anodising
Dimensional requirements
Flatness on thermal interfaces; fine pin diameters with tight tolerances.
Surface finish requirements
Ra 0.8–1.6 µm on thermal interfaces; cosmetic surfaces defined by appearance standard.
Inspection requirements
Dimensional and visual inspection; plating thickness via partners.
Relevant standards
| RoHS 2011/65/EU · REACH | EU restriction of hazardous substances in electrical and electronic equipment (RoHS) and chemicals regulation (REACH). Relevant e.g. to lead in free-machining brass and steel. |
| IEC 60529 | Degrees of protection provided by enclosures (IP code). |
| ISO 2768-1 / -2 | General tolerances for linear and angular dimensions (part 1: f, m, c, v) and for geometrical features without individual indications (part 2: H, K, L). Part 2 is being superseded by ISO 22081. |
| ISO 21920-1 / -2 / -3 | Current ISO standard for surface texture profile: drawing indication (part 1), terms and parameters (part 2), specification operators (part 3). Replaces ISO 1302 and ISO 4287/4288. |
| ISO 13715 | Indication of edges of undefined shape: burr, sharp edge and undercut tolerances on drawings. |
Engineering considerations
- Account for plating and anodising thickness
- Specify cosmetic surfaces
- Define flatness on interfaces
- Specify RoHS compliance
Potential manufacturing solutions
Milling and Swiss-type turning with coordinated plating, anodising and appearance inspection.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.