Defence manufacturers source housings, brackets, shafts and mechanisms for vehicles, optics and equipment. Requirements typically include traceability, controlled documentation and specified surface treatments. Export-control and end-use rules are reviewed for every project.
Typical machined components
- Housings and enclosures
- Brackets and mounts
- Shafts and mechanisms
- Optical and sensor mounts
- Vehicle components
- Fixtures and test equipment

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- High-strength steels and aluminium alloys
- Specified surface treatments (anodising, phosphating)
- Drawing confidentiality
- Documentation and traceability
Dimensional requirements
Tolerances per customer drawing, often with GD&T per ASME Y14.5 or ISO.
Surface finish requirements
Ra 1.6–3.2 µm typical; finishes per specification.
Inspection requirements
Full dimensional reports, material certificates and process records. AQAP requirements are reviewed per contract.
Relevant standards
| AQAP 2110 | NATO quality assurance requirements for design, development and production. |
| ASME Y14.5 | US standard for dimensioning and tolerancing (GD&T). Similar symbols to ISO, but different default rules (e.g. Rule #1 envelope principle). |
| ISO 1101 | Geometrical tolerancing — form, orientation, location and run-out; symbols, tolerance frames and their interpretation. |
| EN 10204 | Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts. |
| ISO 9001 | Quality management systems — requirements. |
Engineering considerations
- Specify treatments by standard
- Define marking requirements
- Clarify documentation package
- Highlight export-control classification
Potential manufacturing solutions
Machining to drawing with controlled documentation, coordinated surface treatments and inspection records. No defence approvals are implied; requirements are reviewed per enquiry.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.