Valve trims, stems, bonnets, connectors and fittings must meet pressure ratings and, where sour service applies, hardness and material requirements. Thread forms and sealing surfaces are critical.
Typical machined components
- Valve stems, seats and balls
- Bonnets and flanges
- Threaded connectors and subs
- Instrumentation fittings
- Pump and compressor parts
- Downhole tool components

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- Duplex and nickel alloys with severe work hardening
- API and NPT thread forms with gauging
- Sealing surfaces with tight finish limits
- Hardness limits for sour service
Dimensional requirements
Threads per API or ASME B1.20.1 with gauging; sealing faces flatness-controlled. Remaining dimensions to drawing.
Surface finish requirements
Sealing surfaces Ra 0.4–0.8 µm; ball and seat surfaces may need lapping or grinding.
Inspection requirements
Thread gauging, hardness testing, PMI and 3.1 or 3.2 certificates. Third-party witness inspection is common and can be accommodated.
Relevant standards
| API 6A / API 6D | Wellhead and christmas-tree equipment (6A) and pipeline valves (6D). |
| ISO 15156 / NACE MR0175 | Materials for use in H₂S-containing environments in oil and gas production (sour service), including hardness limits. |
| EN 10204 | Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts. |
| ASME B1.20.1 | Pipe threads, general purpose, inch (NPT). |
| ATEX 2014/34/EU | EU directive for equipment intended for use in potentially explosive atmospheres. |
Engineering considerations
- State whether sour-service requirements apply
- Define coating/overlay areas
- Specify thread gauge type
- Clarify witness points for inspection
Potential manufacturing solutions
Turning, mill-turn and threading with coordinated heat treatment, overlay and testing through partner suppliers.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.