Many machined parts do not belong to a single sector: plates, shafts, bushings, brackets and small assemblies. A clear drawing, sensible tolerances and the right material keep cost and lead time under control.
Typical machined components
- Plates and brackets
- Shafts and pins
- Bushings and spacers
- Flanges and adapters
- Small assemblies
- Spare and replacement parts

Common materials
Materials · Material Equivalents
Manufacturing processes
Machining challenges
- Incomplete drawings or legacy parts
- Material availability
- Tolerances tighter than function requires
- Small batch economics
Dimensional requirements
General tolerances ISO 2768-mK unless specified; fits per ISO 286.
Surface finish requirements
Ra 1.6–3.2 µm typical.
Inspection requirements
Dimensional checks with reports on request; material certificates.
Relevant standards
| ISO 2768-1 / -2 | General tolerances for linear and angular dimensions (part 1: f, m, c, v) and for geometrical features without individual indications (part 2: H, K, L). Part 2 is being superseded by ISO 22081. |
| ISO 286-1 / -2 | ISO code system for tolerances on linear sizes: standard tolerance grades (IT) and fundamental deviations for holes and shafts; basis of fits such as H7/g6. |
| ISO 1101 | Geometrical tolerancing — form, orientation, location and run-out; symbols, tolerance frames and their interpretation. |
| ISO 68-1 / ISO 261 | ISO general-purpose metric screw threads: basic profile (68-1) and general plan of diameters and pitches (261). |
| EN 10204 | Types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2. The 3.1 certificate is the usual minimum for traceable machined parts. |
Engineering considerations
- Provide 3D model and 2D drawing
- Specify only necessary tolerances
- Choose available materials
- Combine parts where possible
Potential manufacturing solutions
Milling and turning, with integration of casting, sheet metal and fabrication through our manufacturing network.
Requirements depend on the specific part, drawing and customer specification. Sector approvals or certifications are not implied; where a project requires them, this is confirmed during the RFQ review.