Inspection planning
For each part we identify critical characteristics, choose measuring methods and define the frequency — first part, in-process, final. The result is an inspection plan agreed with you before production.
| Stage | Purpose | Typical methods |
|---|---|---|
| Incoming material | Correct grade and condition | Certificate review, marking check, PMI when required |
| First article | Process produces a conforming part | Full dimensional measurement, ballooned report |
| In-process | Detect drift early | Gauges, probing, SPC on key features |
| Final | Release of the batch | Sampling per plan, visual, documentation check |
| Pre-shipment | Correct quantity, packing, labelling | Packing list, photos |
Documentation we can provide
- Dimensional inspection report (ballooned drawing)
- First article inspection report (AS9102-style forms on request)
- Material certificates EN 10204 3.1 (3.2 via third party)
- Certificates of treatment (heat treatment, coating, passivation)
- Certificate of conformity
- PPAP / PPA elements when specified
Internal, partner and independent inspection
We distinguish clearly between internal inspection by MACHINING.TR and its manufacturing organisation, partner laboratory testing (e.g. chemical analysis, mechanical tests, NDT) and independent third-party inspection by an inspection body you nominate or we arrange on your behalf.
We do not list certifications on this website unless they are verified and current. The quality-system status relevant to your order is stated in the quotation.